Categories

Archives

A sample text widget

Etiam pulvinar consectetur dolor sed malesuada. Ut convallis euismod dolor nec pretium. Nunc ut tristique massa.

Nam sodales mi vitae dolor ullamcorper et vulputate enim accumsan. Morbi orci magna, tincidunt vitae molestie nec, molestie at mi. Nulla nulla lorem, suscipit in posuere in, interdum non magna.

Controversial power grid hearings on hold

Hearings to connect the city’s power grid to a controversial power plant in the U.S. are on hold until September, The Vancouver Sun reports.

Canada’s National Energy Board has been holding hearings since May to consider Sumas Energy II’s request to connect the proposed 660 megawatt, natural-gas fired power plant in Sumas, Wash., to the high-voltage transmission grid near Abbotsford.

Comments are closed.